Project Description

Name/Location: SLC to Coalville & SLC to Logan

Year: 1948

Work done: Installation of 20” high-pressure pipeline from Hogle zoo, up over the summit to Coalville. Installation of 20” HP pipeline from Emigration, behind the university, past city creek, and over to Logan. Both jobs were installed around the same time and used the same size pipe. There is overlap between the pictures but it’s not clear which pictures go to which job.

Join in our proud tradition by becoming a member of our tight-knit family of natural gas workers