Project Description

Name/Location: Brian Head Ski Resort

Year: 1993

Work done: Installed over 16,000 ft of pvc and ductile iron supply lines – sizes 2” thru 8” – approx. 39,000 ft of welded steel pressure lines, over 53,000 ft of power and control cables, and all snow making hydrants, electrical pedestals, and other appurtenances for a complete snow making system. This system was installed in a very environmentally sensitive area with no major problems with controlling agencies.

Join in our proud tradition by becoming a member of our tight-knit family of natural gas workers