Project Description
Name/Location: 6400 West, 300 South 6-inch Steel Pipeline and Regulator Station
Year: 2023
Work Done: In an industrial area, a series of new buildings merited a greater supply of natural gas. We installed a six-inch steel pipeline via directional drilling and open-trench excavation, as well as a regulator station to receive the new supply of high-pressure gas, and from it decrease the overall pressure to render the gas accessible. Following an intricate bypass connection and tie-in, plastic piping could then be run from the regulator station to supply the new buildings.