Project Description

Name/Location: 800 East, 100 South 8-inch IHP Piping

Year: 2023

Work Done: Most types of piping, while intended to last, will eventually need to be replaced; and in older areas, an increase in the flow of natural gas is sometimes necessary. This job was conceived for these purposes. Utilizing a combined installation of directional drilling and open-trench excavation, eight-inch IHP piping was run from 200 South to South Temple and was consequently sourced via service fittings to provide the nearby houses with new lines. The landscaping, sidewalks, and road surfaces were then restored.

Join in our proud tradition by becoming a member of our tight-knit family of natural gas workers