Project Description
Name/Location: PG&E Indian Canyon – Price, UT
Year: Completed November 1993
Work done: Methane gathering system & water re-injection system. Installed 55,659’ of fiberglass pipeline, sizes 2” thru 8”. Pipelines used to transport methane gas and process water from 25 wells to processing facilities and carry processed water back to re-injection wells. A power distribution system of over 210,000 ft of buried cable, transformers, and other electrical appurtenances was installed in conjunction with the pipeline system. The project covered a n area of rough terrain – over 22,000’ of required blasting.