Project Description

Name/Location: Wasatch Dr. – 1300 S to 3300 S

Year: Completed August 1995, 3 weeks ahead of schedule.

Work done: Installation of 13,750’ of 24” steel pipeline along 2700 East from 1300 South to 3300 South. 100% x-ray, 100% import at 95% compaction. Natural gas transmission pipeline through a SLC residential area on the east bench. 600’ of 36” casing was installed under I-80 at 2700 East in SLC. Inserting and laying 1000’ of 24” HP carrier pipe.

Join in our proud tradition by becoming a member of our tight-knit family of natural gas workers